Hess Provides Update on Drilling and Development Activities Offshore Guyana
Hess Corporation Logo header
SEARCH

Hess Provides Update on Drilling and Development Activities Offshore Guyana

  • Stena Carron
01.07.2019
  • Two exploration wells to be drilled in January
  • Growing Turbot area offers significant development options
  • Liza Phase 1 development on track for first oil in early 2020

Hess Corporation said today that drilling has begun on the Haimara-1 exploration well offshore Guyana, the first of two planned exploration wells in January. The Stena Carron drillship is drilling the Haimara-1 well, located 19 miles (31 kilometers) east of the Pluma-1 discovery in the southeastern part of the Stabroek Block.

The Noble Tom Madden drillship will drill the second well, Tilapia-1, located three miles (five kilometers) west of the Longtail-1 discovery. The Tilapia-1 well is located in the growing Turbot area.

Operator ExxonMobil is progressing the Liza Phase 1 development, which has moved into its peak execution phase ahead of expected startup in early 2020. Drilling of development wells in the Liza field is continuing using the Noble Bob Douglas drillship, subsea equipment is being prepared for installation, and the topside facilities modules are being installed on the Liza Destiny floating, production, storage and offloading (FPSO) vessel in Singapore.

Full story

Related News
  • Hess Schedules Q4 2019 Earnings Release Conference Call

    Hess will hold a conference call on Wednesday, January 29, 2020 at 10 a.m. Eastern Time to discuss its fourth quarter 2019 earnings release.
    Full story
  • Hess Announces Oil Discovery Offshore Guyana at Mako-1

    Hess today announced another oil discovery on the Stabroek Block offshore Guyana at the Mako-1 well southeast of the Liza Field. The discovery adds to the current gross recoverable resource estimate of more than 6 billion barrels of oil equivalent.
    Full story
  • Hess Announces First Production from the Liza Field, Offshore Guyana

    Hess today announced startup of production from the Liza Field offshore Guyana, less than five years after the first discovery of hydrocarbons and well ahead of the industry average for deepwater developments. Production from the first phase of the Liza Field, located in the Stabroek Block, is expected to reach full capacity of 120,000 gross barrels of oil per day in the coming months, with the first cargo set to be sold within several weeks.
    Full story