Hess in World Oil: New Sucker Rod Coupling Could Save Millions
Hess Corporation Logo header
SEARCH

Hess in World Oil: New Sucker Rod Coupling Could Save Millions

  • Pumpjacks in North Dakota
06.20.2016

Hess is featured in this month's World Oil magazine for a new patent-pending sucker rod coupling that could save Hess and other operators millions of dollars per year. The invention was developed by Hess and Materion and is expected to reduce annual per well workover costs by $75,000-$100,000.

Hess employees Seth Silverman, Senior Production Engineering Adviser, and Logan Stoner, MR&I Bakken Subsurface Lead, co-authored the article and, along with Chuck Panzer, Senior Reliability Technician, played key roles in developing the innovation. Silverman said that such an innovation couldn’t have come at a better time for the industry, as crude price volatility has driven a great need for operators to increase efficiency, reduce waste and cut costs.

Click here to read the article

Related News
  • Hess Named to Dow Jones Sustainability Index North America for Tenth Consecutive Year

    Hess has earned a place on the prestigious Dow Jones Sustainability Index (DJSI) North America for the tenth consecutive year. The index, which recognizes public companies for outstanding performance across economic, environmental and social factors, is used as a reference by shareholders who consider sustainability when making investment decisions.
    Full story
  • Hess Announces Another Oil Discovery Offshore Guyana at Tripletail

    Hess announced a discovery at the Tripletail-1 well on the Stabroek Block offshore Guyana. Tripletail-1 encountered approximately 108 feet (33 meters) of a high quality oil bearing sandstone reservoir.
    Full story
  • Hess Announces Arrival of Liza Destiny Offshore Guyana

    Hess announced today that the Liza Destiny, Guyana's first oil production vessel, has arrived at the Stabroek Block. The Floating, Production, Storage and Offloading (FPSO) vessel arrived following a 42 day journey from Singapore. This FPSO is a significant component of the Liza Phase 1 development, which involves four undersea drill centers with 17 wells.
    Full story