Hess in the Media: Upstream Highlights Stampede Topsides Installation
Hess Corporation Logo
SEARCH

Hess in the Media: Upstream Highlights Stampede Topsides Installation

  • The topsides for Stampede being fabricated in Ingleside, Texas

Upstream reported on Nov. 18 that the Stampede Development had achieved a major milestone with the safe and successful installation of the topsides facility, while sticking to its target of delivering first oil in 2018.

“U.S. player Hess’ Stampede tension-leg platform in the Gulf of Mexico has achieved a major milestone after the company successfully lifted the topsides deck on the hull,” the article said.

The platform is under construction at Kiewit Offshore Services in Ingleside, Texas, which built the topsides. Samsung Heavy Industries of South Korea built the hull.

“We successfully lifted and set the topsides deck on the hull,” Hess COO Greg Hill told investors on a conference call.

Hess operates the Stampede project with a 25 percent stake; co-owners are Chevron, Statoil and Nexen.

The facility will have capacity for 80,000 barrels per day of oil and 100,000 bpd of water injection capacity.

Click here to read the article

Latest Hess News
  • Hess Schedules Earnings Release Conference Call

    NEW YORK--(BUSINESS WIRE)--Jul. 5, 2017-- Hess Corporation (NYSE:HES) announced today that it will hold a conference call on Wednesday, July 26, 2017 at 10 a.m. Eastern Daylight Time to discuss its second quarter 2017 earnings release.
    Full story
  • Hess Sanctions Liza Phase 1 Development Offshore Guyana

    Hess has sanctioned the first phase of development of the Liza Field, one of the industry’s largest oil discoveries, located on the Stabroek Block offshore Guyana.
    Full story
  • In the Media: WSJ cites Hess as Part of Bakken Drilling Resurgence

    Drillers are inching back to action in North Dakota’s Bakken shale region, a sign of the recovery of the American oil and gas sector, writes the Wall Street Journal.
    Full story